[Corps of Engineers]  [Northwestern Division]  [NWD Water Management]  [Hydropower Evaluation]



White River Water Supply Reallocation Study

This study was conducted for the Little Rock District of the Corps of Engineers to determine the impacts upon hydropower generation associated with water supply withdrawals from five Corps projects. These projects are located within the White River Basin in Missouri and Arkansas. The projects evaluated include Beaver, Table Rock, Bull Shoals, Norfork, and Greers Ferry. The analysis included computation of  power benefits foregone,  power revenues foregone, and credit to the Federal Power Marketing Agency (Southwestern Power Administration).

                                  Sunset over Beaver Creek                              Bull Shoals Reservoir and Dam

  

Greers Fery Dam

 

Back to Main List



Pagemaster: Dinh Quan; (503)808-3979 CENWD-NP-ET-WP
Webmaster:Mike Stanfill;CENWP-IM-IW
Last Updated: 2 May 2000