Water Quality Program
This web site provides information about the U.S. Army Corps of Engineers program for water quality management in the Northwestern Division (Columbia Basin). This program includes monitoring of total dissolved gas, water temperature and turbidity; scheduling of reservoir operations for water quality; computer modeling; and performing studies designed to restore and enhance water quality in streams, rivers and lakes within the Columbia River Basin.
TOTAL DISSOLVED GAS
Monitoring Plans of Action
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010-14
TDG WAIVERS
| OR - TDG Rule of Modification 2008 | WA - TDG Criteria Adjustment 2008 |
REGIONAL WATER QUALITY PLANS
8-Oct-2002 Water Quality Team Meeting
Joint Operation Explanation
Proposed Scope of Study
CHJ Presentation
Spill Change Guidance
|
SYSTDG User's
Manual |
1.2 MB |
SYSTDG Model -
Version 3/1/05 ![]() |
39.7 MB |
|
3/9/05 Training |
|
| WQ Team Agenda | 0.01 MB |
| SYSTDG Case Studies | 3.0 MB |
| SYSTDG Overview 1 | 0.5 MB |
| SYSTDG Overview 2 | 0.2 MB |
| SYSTDG Training Properties & Processes | 1.2 MB |
Includes TDG and temperature info on Corps projects on the Columbia and Snake rivers.
Summary of Districts' Water Quality programs and activities in the Northwest Division, Columbia Basin.
Total Dissolved Gas Measurements at Dworkshak Dam, November, 2006
Data Individual Sites vs Spill Graphs, November, 2006
Total Dissolved Gas Exchange at Lower Granite Dam, 2002 Spill Season
Draft Total Dissolved Gas Characterization of the Lower Columbia River below Bonneville Dam, March 1, 2006
Response to Agency comments on Total Dissolved Gas Effects on Fishes of the Lower Columbia River, February 6, 2006
Total Dissolved Gas Effects on Fishes of the Lower Columbia River, March 2006
Management of Spill at Bonneville Dam: Cascade Island TDG Gauge, January 17, 2006
Lower Columbia River Total Dissolved Gas Brief, December 12, 2005
Libby Dam January 2005 Relay Maintenance Operations TDG Monitoring Study, March 2005
Bi-Op Measure 132 Final
Report, December, 2004:
"Total Dissolved Gas Forebay Fixed Monitoring Station Review and
Evaluation for Lower Snake River Projects and McNary Dam,
2003-2004"
John Day RPA 132 2004 Report, November, 2004:
Total Dissolved Gas Exchange at Bonneville Dam, 2002 Spill Season
12-Jun-2007
| Effects of Bonneville Dam Spillway Operations on Fish Passage | Mike Langeslay, NWP |
| Bonneville Spill Pattern Development | Randy Lee, NWP |
| Bonneville Dam TDG Production, Fate, and Transport | Mike Schneider |
| Bonneville Spillway Channel TDG 2007: Using Subermisble Pumps | Joe H. Carroll, contractor |
| Effects of Total Dissolved Gas on Chum Fry | David Geist, Battelle |
| 2002 TDG TMDL Load Allocation Compliance Locations | Agnes Lut |
Spill and TDG Summary
(1999)
Temperature Summary
(1998)
CHJ/GCL: Study Plan (Nov.98) and Spill Test (June 99)
WATER QUALITY MODELS:
2001 Drought Modeling, PNNL
(5/1/01) ![]()
Air Temp Pendleton ![]()
Selected Pages
(Lower Granite,
Ice Harbor,
McNary)