TOTAL DISSOLVED GAS REPORT FOR LOWER GRANITE starting at 0014 20 may 2012 WA TM BARO TD GAS GAS SPILL TOT DEPTH OF COMPENSATION DATE TIME DEG F PRES PRES % QS QR GAGE(FT) DEPTH(FT) ** 0520 0100 52.2 742.7 784.0 105.6 020.6 104.2 51.2 1.8 0520 0200 52.3 742.6 784.0 105.6 020.6 103.4 51.4 1.8 0520 0300 52.3 742.6 785.0 105.7 020.7 103.6 51.2 1.8 0520 0400 52.4 742.6 785.0 105.7 020.6 103.5 51.4 1.8 0520 0500 52.3 742.6 786.0 105.8 020.5 103.0 51.3 1.9 0520 0600 52.3 742.7 786.0 105.8 020.6 103.2 51.3 1.9 0520 0700 52.3 742.7 786.0 105.8 020.9 103.3 51.2 1.9 0520 0800 52.2 742.7 786.0 105.8 021.3 104.0 51.2 1.9 0520 0900 52.2 742.4 786.0 105.9 025.2 115.5 51.1 1.9 0520 1000 52.2 742.1 786.0 105.9 025.1 115.6 51.3 1.9 0520 1100 52.2 742.0 786.0 105.9 025.1 115.8 51.3 1.9 0520 1200 52.2 741.5 786.0 106.0 025.0 115.7 51.4 1.9 0520 1300 52.1 741.5 786.0 106.0 024.3 115.3 51.4 1.9 0520 1400 52.3 741.5 786.0 106.0 020.5 111.3 51.4 1.9 0520 1500 52.2 741.5 786.0 106.0 020.5 104.8 51.3 1.9 0520 1600 52.1 741.2 785.0 105.9 020.5 104.5 51.3 1.9 0520 1700 52.1 741.4 785.0 105.9 020.5 104.3 51.4 1.9 0520 1800 52.1 741.8 785.0 105.8 020.5 104.4 51.4 1.9 0520 1900 52.5 741.6 787.0 106.1 020.5 104.3 51.4 2.0 0520 2000 52.3 741.6 786.0 106.0 020.5 106.3 51.4 1.9 0520 2100 52.2 741.7 785.0 105.8 020.4 106.3 51.4 1.9 0520 2200 52.0 742.0 784.0 105.7 020.4 102.9 51.3 1.8 0520 2300 52.1 741.3 784.0 105.8 020.4 098.8 51.3 1.9 0521 000 52.1 740.9 784.0 105.8 020.3 094.3 51.3 1.9 ** Calculation of compensation depth @ 120% TDG [Baro. Pres. (765) - TDG Pres. (918)]/23 = 6.7 ft.