XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX APW R 020912 0750 WI ND NP JD WILLOW CREEK SCHEDULE SCHEDULE FOR: FEB 09 (THU) - FEB 13 (MON) PROJECT : APPROX TOTAL RELEASE EFFECTIVE ----------- -------------------- ------------------ WILLOW CREEK : RELEASE = 9 CFS 0700 HRS 09 FEB RELEASE = 6 CFS 1200 HRS 09 FEB NOTES: 1. REDUCE WILLOW CREEK OUTFLOW TO 6 CFS ON THURSDAY. RESERVOIR REFILL BEGINS FEB 1. OBJECTIVE IS TO MAINTAIN THE LAKE ELEVATION NEAR THE REFILL SCHEDULE 2. MINIMUM OUTFLOW IS 3 CFS. 3. WHEN INCREASING OR DECREASING OUTFLOW, A RAMP RATE OF AROUND 0.2 FT/HR, MEASURED AT WILO, IS PREFERRED. STAGE CHANGE AT WILO SHOULD NOT EXCEED 0.5 FT/HR PER THE WATER CONTROL MANUAL, UNLESS IN A FLOOD SITUATION. ************************************************************** OFFICE HOURS CONTACT NUMBERS (WORK DAYS 0630-1600): OFFICE BLACKBERRY 1. ALAN DONNER (503)808-4891 (503)475-2492 2. MIKE RICE (503)808-4877 (503)367-6579 3. NWP RCC (503)808-4896 (NO VOICE MAIL) ************************************************************** AFTER HOURS CONTACT NUMBER (SEE CONTACT LIST FOR HOME PHONE): 1. MIKE RICE (503)367-6579 2. ALAN DONNER (503)475-2492 ************************************************************** ALAN DONNER RRCBT/WILLOWCREEK.TXT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX