TECHNICAL MANAGEMENT TEAM

BOR: Pat McGrane\Tony Norris

NMFS: Paul Wagner\Chris Ross     BPA: Scott Bettin\Robyn MacKay

USFWS: Howard Schaller\Bob Hallock\Susan Martin

OR: Christine Mallette     WA: Jim Nielsen    ID: Steve Pettit

MT: Jim Litchfield    COE: Cindy Henriksen\Rudd Turner\Dick Cassidy

   20 June 2001          0900 - 1200 hours

Custom House    Room 118

Portland, Oregon

   Conference call line:   503-808-5190

All members are encouraged to call Donna Silverberg with any issues or concerns they would like to see addressed. Please e-mail her at dsilverberg@cnnw.net or call her at (503) 248-4703.

AGENDA

1. Welcome, introductions.

2. Review current system conditions.

·        reservoir operation, water supply, water quality (COE, BOR)

·        power system status (BPA)

·        fish migration status (NMFS, USFWS)

3. Review operations  requests .

4. Develop recommended operations. 

5. TMT process discussion.

·        feedback from facilitator evaluation survey

·        update TMT guidelines

·        Water Management Plan 

6. Chum salmon genetics (WDFW).

7. McNary warm temperature operations -- FPOM discussions (COE).

8. Water temperature modeling results (COE, NMFS).

9. Other.

·        set agenda for 3 July 1-4 p.m. TMT meeting

Questions about the meeting may be referred to Cathy Hlebechuck, (503) 808-3942 or Dick Cassidy, (503) 808-3938.