TECHNICAL MANAGEMENT TEAM
BOR: Tony Norris / John Roache BPA: Scott Bettin / John Wellschlager
NMFS: Paul Wagner / Chris Ross USFWS: David Wills / Steve Haeseker
OR: Ron Boyce WA: Cindy LeFleur ID: Russ Kiefer MT: Jim Litchfield
COE: Cindy Henriksen / Rudd Turner / Cathy Hlebechuk

TMT MEETING

Wednesday     August 25, 2004     0900 - 1200 hours

Custom House Room 118
Portland, Oregon
Conference call line: 503-808-5190


All members are encouraged to call Donna Silverberg with any issues or concerns they would like to see addressed.
Please e-mail her at dsilverberg@cnnw.net or call her at (503) 248-4703.

AGENDA

  1. Welcome and introductions.
  2. Bonneville Spillway Discrepancy -
    [Proposed Process to improve accuracy of Bonneville Spillway Discharge - DRAFT August 13, 2004] PDF
  3. Lower Granite Powerhouse outage, September 20-26: Salmon managers; recommended spill operation
  4. Status of Dworshak/Lower Granite Tailrace Temperature
    1. [Dworshak Outflows and Lower Granite Tailwater Temperatures in 2004] PDF
    2. [2004 - CHANGES IN WATER TEMPERATURE OVER TIME DWORSHAK RESERVOIR] PDF
    3. [Clearwater River at Peck (1979, 1991, 1994 weather) and Lower Granite Dam (1979, 1991, 1994 weather)] PDF
    4. [SOR #2004-18] PDF
  5. Autumn Treaty Fishery [SOR 2004-C9] PDF
  6. End of MOP Operation in Lower Snake River
  7. Status of Operation
    1. Reservoirs
    2. Fish
    3. Power System
    4. Water Quality
      1. Temp [McNary Tailwater Temperatures] PDF [Dworshak Water Temperatures] PDF
      2. Spill : [2002] [2003] [2004]
        [Aug 3-23 Average Daily Spill] PDF
        [Aug 3-23 Exceedance Types] PDF
      3. TDG : [August 2004]
      4. Gas Caps : [2002] PDF [2003] PDF [2004] PDF
  8. Other
Questions about the meeting may be referred to Cindy Henriksen at (503) 808-3945, or Rudd Turner at (503) 808-3935, or Cathy Hlebechuk at (503) 808-3942