| Complete Document | ||
| Final 2010 Fish Passage Plan | ||
| Individual Plan Sections | ||
| 1.0 | Table of Contents |
|
| 1.1 | Overview |
|
| 2.0 | Bonneville |
|
| 3.0 | The Dalles |
|
|
*Table TDA-6 has been revised. The revised table can be found at: 10TDA 005 Table TDA 6 Revision - Approved |
||
| 4.0 | John Day |
|
| 5.0 | McNary |
|
| Table MCN-11 McNary Dam Spill Pattern During TSW Removal | ||
| 6.0 | Ice Harbor |
|
| Table IHR-13 Ice Harbor RSW 45kcfs/Spill Cap Spill Pattern | ||
| 7.0 | Lower Monumental |
|
|
*Table LMN-5 has been revised. The revised table can be found at: 10LMN 001 LMN Turbine Priority Clarification 3 - Approved |
||
| 8.0 | Little Goose |
|
|
*Tables LGS 11, 12, & 13 have been revised. The new tables can be found at: 11LGS 001 LGS SW Operations - Approved |
||
| 9.0 | Lower Granite |
|
| Appendices | ||
| 10.0 | A. Special Project Operations and Studies Bonneville |
|
| 11.0 | A. Special Project Operations and Studies The Dalles |
|
| 12.0 | A. Special Project Operations and Studies John Day |
|
| 13.0 | A. Special Project Operations and Studies McNary |
|
| 14.0 | A. Special Project Operations and Studies Ice Harbor |
|
| 15.0 | A. Special Project Operations and Studies Lower Monumental |
|
| 16.0 | A. Special Project Operations and Studies Little Goose |
|
| 17.0 | A. Special Project Operations and Studies Lower Granite |
|
| 18.0 | B. Corps of Engineeers Juvenile Fish Transportation Plan |
|
| 19.0 | C. BPA's System Load Shaping Guidelines Regarding Turbine Operation and Best Efficiency |
|
| 20.0 | D. Corps of Engineers Plan of Action for Dissolved Gas Monitoring in 2010 |
|
| 21.0 | E. Fish Operations Plan |
|
| 22.0 | F. Guidelines for Dewatering and Fish Handling (Salvage) Plans |
|
| 23.0 | G. Protocols for Adult Fish Trapping Operations at Bonneville, Ice Harbor and Lower Granite Dams | |
|
*Appendix G has been revised. The revision can be found at: Appendix G Revised May 19, 2010 - Approved |
||
| 24.0 | H. Turbine Dewatering Procedure for Chief Joseph Dam |
|
| 25.0 | I. List of Acronyms |
|
| 26.0 | J. Protocols for Juvenile Monitoring Facility Operations at Bonneville Dam |
|
| 27.0 | K. Protocols for Smolt Monitoring Facility Operations at John Day Dam |
|
| Draft 2010 Fish Passage Plan | ||
| Final 2009 Fish Passage Plan | ||
| Change Forms for the 2010 Fish Passage Plan. To propose a change, please send a change form or a modified existing change to the Fish Passage Plan Coordinator. |
|
|
| Draft 2011 Fish Passage Plan | ||