| Complete Document | ||
| Final 2011 Fish Passage Plan | ||
| Individual Plan Sections | ||
| Table of Contents |
|
|
| 1.0 | Overview |
|
| 2.0 | Bonneville |
|
| 12BON001 Spill Operations Relocated to Appendix E | ||
| BON Special Spill Pattern - Dec. 29, 2011 | ||
| BON Special Spill Pattern - Jan. 19, 2012 | ||
| 3.0 | The Dalles |
|
|
*Table TDA 6 has been revised. The revised table can be found at: TDA 6. Spill Pattern Revised April 20, 2011 |
||
| 4.0 | John Day |
|
|
*Table JDA 10 was not included in the 2011 FPP. Table JDA 10 taken from the 2010 FPP is included below: JDA 10. Spill Pattern without TSWs |
||
| 5.0 | McNary |
|
| 6.0 | Ice Harbor |
|
|
*Table IHR-12 has been revised. The revised table can be found at: Table IHR-12 Ice Harbor RSW 30% Spill Pattern (Revised 5/17/11) |
||
| 7.0 | Lower Monumental |
|
|
*Table LMN-12 has been revised. The revised table can be found at: Table LMN-12 Bulk Spill Pattern |
||
|
*Table LMN-13 has been revised. The revised table can be found at: Table LMN-13 Uniform Spill Pattern |
||
|
*Table LMN-13 has been revised. The revised table can be found at: Table LMN-13 Uniform Spill Pattern |
||
| 12LMN001 Spill Operations Relocated to Appendix E | ||
| 8.0 | Little Goose |
|
| 12LGS002 Spill Operations Relocated to Appendix E | ||
| 9.0 | Lower Granite |
|
| 12LWG001 Spill Operations Relocated to Appendix E | ||
| Appendices | ||
| 10.0 | A. Special Project Operations and Studies Bonneville |
|
|
*The COE revised 2.2 Adult Kelt Passage at B1 Sluiceway and B2CC. The revision may be found at: 2.2 Adult Kelt Passage |
||
| 11.0 | A. Special Project Operations and Studies The Dalles |
|
| 12.0 | A. Special Project Operations and Studies John Day |
|
| 13.0 | A. Special Project Operations and Studies McNary |
|
| 14.0 | A. Special Project Operations and Studies Ice Harbor |
|
| 15.0 | A. Special Project Operations and Studies Lower Monumental |
|
| 16.0 | A. Special Project Operations and Studies Little Goose |
|
| 17.0 | A. Special Project Operations and Studies Lower Granite |
|
| 18.0 | B. Corps of Engineeers Juvenile Fish Transportation Plan |
|
| 19.0 | C. BPA's System Load Shaping Guidelines Regarding Turbine Operation and Best Efficiency |
|
| 20.0 | D. Corps of Engineers Plan of Action for Dissolved Gas Monitoring |
|
| 21.0 | E. Fish Operations Plan |
|
| 22.0 | F. Guidelines for Dewatering and Fish Handling (Salvage) Plans |
|
| 23.0 | G. Protocols for Adult Fish Trapping Operations at Bonneville, Ice Harbor and Lower Granite Dams |
|
| 24.0 | H. Turbine Dewatering Procedure for Chief Joseph Dam |
|
| 25.0 | I. Dworshak Fish Protection Procedures for Turbine Maintenance |
|
| 26.0 | J. Protocols for Juvenile Monitoring Facility Operations at Bonneville Dam |
|
| 27.0 | K. Protocols for Smolt Monitoring Facility Operations at John Day Dam |
|
| 28.0 | L. List of Acronyms |
|
| Final 2010 Fish Passage Plan | ||
| Draft 2011 Fish Passage Plan | ||
| Change Forms for the 2011 Fish Passage Plan. To propose a change, please send a change form or a modified existing change to the Fish Passage Plan Coordinator. |
|
|