US Army Corps of Engineers

Lost Creek Dam

December 2022

Day of MonthTotal Generation MWhAverage Generation MWStation Use MWhInflow cfsTotal Outflow cfsGeneration Flow cfsSpill cfsMidnight Reservoir ElevationAverage Forebay ElevationAverage Tailwater ElevationAverage Head feetMidnight Storage ac-ft
1 908 1060 1798.67 1798.70 1551.50 247.20241184.57
2 1050 1798.54 1798.60 1551.50 247.10240875.77
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOT            
AVG    908 1055   1798.61 1798.65 1551.50 247.15241030.17
MAX    908 1060   1798.67 1798.70 1551.50 247.20241184.57
MIN    908 1050   1798.54 1798.60 1551.50 247.10240875.77