US Army Corps of Engineers

McNary Dam & Lake Wallula

December 2023

Day of MonthTotal Generation MWhAverage Generation MWStation Use MWhInflow kcfsTotal Outflow kcfsGeneration Flow kcfsSpill kcfsMidnight Reservoir ElevationAverage Forebay ElevationAverage Tailwater ElevationAverage Head feet
1 107.70 115.40 110.70 0.00 338.63 338.96 266.27 72.69
2 101.50 102.50 97.80 0.00 338.54 338.62 265.60 73.02
3 89.40 100.10 95.40 0.00 337.95 338.19 264.91 73.28
4 83.50 85.00 80.30 0.00 337.92 337.93 264.25 73.68
5 78.30 72.50 67.80 0.00 338.24 337.92 263.65 74.27
6 79.20 73.50 68.80 0.00 338.51 338.35 263.60 74.75
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOT           
AVG    89.93 91.50 86.80 0.00 338.30 338.33 264.71 73.61
MAX    107.70 115.40 110.70 0.00 338.63 338.96 266.27 74.75
MIN    78.30 72.50 67.80 0.00 337.92 337.92 263.60 72.69