HourTotal Outflow kcfsGeneration Flow kcfsSpill kcfsPH 1 Forebay ElevationTailwater ElevationAverage HeadProject Forebay ElevationStevenson Gage ElevationProject Tailwater Elevation
1 223.80 60.90150.50 75.00 19.00 56.00 74.90 76.10 19.00
2 219.70 56.60150.70 75.10 18.70 56.40 74.90 76.10 18.80
3 210.50 47.40150.70 75.10 18.30 56.80 75.00 76.10 18.50
4 209.90 46.70150.80 75.20 18.20 57.00 75.00 76.20 18.30
5 219.30 56.20150.70 75.00 18.60 56.40 74.90 76.20 18.60
6 233.90 71.20150.30 74.90 18.90 56.00 74.70 76.10 19.00
7 232.30 69.50150.40 75.00 19.00 56.00 74.70 76.10 19.00
8 220.00 56.80150.80 75.30 18.50 56.80 75.10 76.30 18.60
9 218.30 55.00150.90 75.30 18.40 56.90 75.10 76.30 18.50
10 218.10 54.90150.80 75.20 18.40 56.80 75.00 76.20 18.40
11 218.20 55.10150.70 75.20 18.30 56.90 75.00 76.20 18.40
12 218.30 55.20150.70 75.20 18.30 56.90 75.00 76.20 18.40
13 218.50 55.40150.70 75.10 18.30 56.80 75.00 76.20 18.30
14 218.20 55.20150.60 75.10 18.30 56.80 75.00 76.20 18.40
15 219.30 56.30150.60 74.90 18.40 56.50 74.60 76.20 18.50
16 233.70 71.10150.20 74.80 18.90 55.90 74.70 76.10 19.00
17 234.40 71.80150.20 74.80 19.00 55.80 74.80 76.10 19.00
18 235.70 72.90150.40 75.00 19.10 55.90 74.90 76.30 19.10
19 235.70 72.80150.50 75.00 19.10 55.90 74.90 76.30 19.10
20 235.20 72.20150.60 75.10 19.20 55.90 74.90 76.40 19.30
21
22
23
24
AVG 223.65 60.66150.59 75.06 18.65 56.42 74.91 76.19 18.71
MAX 235.70 72.90150.90 75.30 19.20 57.00 75.10 76.40 19.30
MIN 209.90 46.70150.20 74.80 18.20 55.80 74.60 76.10 18.30

  Powerhouse 1 Powerhouse 2 Project
HourGeneration Flow kcfsForebay ElevationForebay ElevationGeneration Flow kcfsSpillway Gates in UseMiscellaneous Flow kcfs*
1 0.00 75.0 74.9 60.90 18 12.4
2 0.00 75.1 74.9 56.60 18 12.4
3 0.00 75.1 75.0 47.40 18 12.4
4 0.00 75.2 75.0 46.70 18 12.4
5 0.00 75.0 74.9 56.20 18 12.4
6 0.00 74.9 74.7 71.20 18 12.4
7 0.00 75.0 74.7 69.50 18 12.4
8 0.00 75.3 75.1 56.80 18 12.4
9 0.00 75.3 75.1 55.00 18 12.4
10 0.00 75.2 75.0 54.90 18 12.4
11 0.00 75.2 75.0 55.10 18 12.4
12 0.00 75.2 75.0 55.20 18 12.4
13 0.00 75.1 75.0 55.40 18 12.4
14 0.00 75.1 75.0 55.20 18 12.4
15 0.00 74.9 74.6 56.30 18 12.4
16 0.00 74.8 74.7 71.10 18 12.4
17 0.00 74.8 74.8 71.80 18 12.4
18 0.00 75.0 74.9 72.90 18 12.4
19 0.00 75.0 74.9 72.80 18 12.4
20 0.00 75.1 74.9 72.20 18 12.4
21
22
23
24
AVG 0.00 75.1 74.9 60.66 18 12.4
MAX 0.00 75.3 75.1 72.90 18 12.4
MIN 0.00 74.8 74.6 46.70 18 12.4

* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock, PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year indicate the B2CC is open/closed.